Well, now that the 95Racer is finished, which is hard to believe in itself, I’ve decided that I want to see what the antidote would be like. So, having thought about this for some time, this next project will be a road bike. A 2-stroke no less!
In brief, it will consist of:
How did I arrive at this combination? A good friend had this RGV250 with a bit special YPVS engine sitting in his workshop for some time. Everytime, I went there I asked him about it. As he is too busy and would probably never get it finished, I offered to help and take it off his hands. This is what it looked like gathering dust in his workshop.

Now, I was just going to finish it off as it really didn’t need that much. But, as it does, one thing led to another, and the goal posts kept moving. I really liked the thought of doing something with that engine. It has TZ750 pistons, a TZ250 crank, a close ratio gear box with dry clutch. Ideally, I’d like to put a Cheetah top end on it and take it out to just below 500cc. However, that’s for later. I really want to ride it this summer!
So why move the goal posts? It all started after seeing this TZR 3XV with a Stan Stephens 535cc power valve engine in it. It was really lovely looking and far more modern than the RGV250. So, after some measuring and chassis geometry CAD work, I decided to use a TZR frame. Is easily fits the powervalve engine, has a much sportier geometry than the RGV, looks bang up-to-date, and also happens to easily accept a NC30/35 single sided swinging arm. Of course, it needed a modern front end as well, which came from a Kawasaki ZX6-R, but that was more due to availability at a reasonable cost. Most modern radial brake front-ends would work.
So, after a bit of chassis geometry analysis using the ever-so-useful “whole bike software” from Tony Foale, and a bit of alteration, I am now at this stage. The TZR frame is completely unmodified, although it will be later to fit the engine and rear suspension mounts.

The swinging arm was a very easy fit. All it needed was a different size bearing in one end, a couple of spacers, and new inner spacer. The 916 wheel needed the centre hole boring out slightly.
The front was very similar, just needed a new set of bearings and the stem needed cutting down and rethreading.
The main chassis specifications (at static sag) are pretty much ideal with this combination:
Read our latest entries into all our blogs with the newest entry on top. If you read something interesting (or bloody annoying!), let us know! Either way, we'd be pleased to hear from you.
| Mon | Tue | Wed | Thu | Fri | Sat | Sun |
|---|---|---|---|---|---|---|
| << < | Current | > >> | ||||
| 1 | 2 | 3 | 4 | 5 | ||
| 6 | 7 | 8 | 9 | 10 | 11 | 12 |
| 13 | 14 | 15 | 16 | 17 | 18 | 19 |
| 20 | 21 | 22 | 23 | 24 | 25 | 26 |
| 27 | 28 | 29 | 30 | |||